NVIDIA Rubin R200
Disambiguation: searching "R200" may match two entirely different chips — this page is the NVIDIA Rubin GPU (commonly R200). Baidu also has a Kunlunchip R200 (XPU-R inference accelerator, 7nm, 256 TOPS INT8). See its card page if that is what you are looking for.
NVIDIA Rubin R200 is NVIDIA's next-generation AI GPU announced at GTC 2026, built on TSMC 3nm process with 336 billion transistors, equipped with 288GB HBM4 memory, delivering 50 PFLOPS FP4 inference compute, succeeding the Blackwell architecture.
Key Specifications
| Specification | Value |
|---|---|
| GPU Architecture | Rubin Architecture (MCM multi-chip module design) |
| Process Node | TSMC 3nm (4NP custom process) |
| Transistor Count | 336 billion |
| FP4 Inference Compute | 50 PFLOPS |
| FP8 Training Compute | 35 PFLOPS |
| FP16 Compute | Estimated ~25 PFLOPS |
| FP32 Compute | 130 TFLOPS |
| FP64 Compute | 200 TFLOPS |
| INT8 Compute | Estimated ~100 PFLOPS |
| Memory Capacity | 288 GB |
| Memory Type | HBM4 |
| Memory Bandwidth | 22 TB/s |
| Interconnect | NVLink 6 (3.6 TB/s unidirectional) |
| TDP | 1,800-2,300W (liquid cooling required) |
| Release Date | March 17, 2026 |
| Mass Production | Second half of 2026 |
| Pricing | $350-400M per NVL72 rack |
Architecture & Specifications
Rubin R200 adopts a multi-chip module (MCM) design, with the core comprising:
- 2 compute dies (GPU dies)
- 2 I/O dies (handling HBM controllers and NVLink physical layer)
- 8 HBM4 memory stacks
Key Technical Innovations
-
Third-Generation Transformer Engine
- Supports hardware-level adaptive precision compression
- Dynamically switches precision without rewriting model code (FP4/FP6/FP8/FP16/BF16/TF32/FP32/FP64)
-
NVLink 6 Interconnect
- Single GPU full interconnect bandwidth of 3.6 TB/s (bidirectional)
- NVL72 rack total bandwidth of 260 TB/s
-
HBM4 Memory
- 288GB capacity (1.5× increase over Blackwell B200's 192GB HBM3e)
- 22 TB/s bandwidth (2.75× increase over Blackwell B200's 8 TB/s)
Performance Comparison
| Comparison | Blackwell B200 | Rubin R200 | Improvement |
|---|---|---|---|
| Transistor Count | 208 billion | 336 billion | 1.6× |
| Memory Capacity | 192GB HBM3e | 288GB HBM4 | 1.5× |
| Memory Bandwidth | 8 TB/s | 22 TB/s | 2.75× |
| NVLink Bandwidth | 1.8 TB/s | 3.6 TB/s | 2× |
| FP4 Inference | ~10 PFLOPS | 50 PFLOPS | 5× |
| TDP | 1,000W | 1,800-2,300W | 1.8-2.3× |
Platform Configurations
Vera Rubin NVL72
- 72× Rubin R200 GPUs
- 36× Vera CPUs
- Total Compute: ~3.6 EFLOPS FP4
- Total Memory: 20.7 TB HBM4
- Total Bandwidth: 1.58 PB/s
- TDP: ~180kW (full liquid cooling required)
- Pricing: $3.5-4M
Vera Rubin NVL144 (Planned)
- 144× Rubin R200 GPUs
- 72× Vera CPUs
- Total Compute: ~7.2 EFLOPS FP4
- LLM Inference Cost: Reduced to 1/10 of Blackwell platform
Mass Production & Delivery
- Mass Production: Second half of 2026
- First Customers: AWS, Azure, Google Cloud, Oracle Cloud
- MLPerf Inference v6.1 Debut (results published 2026-09-16): Qwen3-VL throughput up to 3.7x GB300 NVL72, DeepSeek-R1 up to 2.5x, with 99% scaling efficiency demonstrated on 288 GPUs
- On-Premises Users: Q1 2027 availability
- Partner Products: Market delivery in second half of 2026
- Shipping spec locked (reported 2026-11-01): NVIDIA finalized HBM4 bandwidth at 19.2 TB/s per GPU (down from the preliminary 22 TB/s), NVLink scale-up at 3.0 TB/s (down from 3.6 TB/s), and raised scale-out networking to 450 GB/s. Compute and 288GB capacity are unchanged. According to ServeTheHome's review of NVIDIA's September data-sheet update, the HGX Rubin NVL8 changed more: seven of eight HBM4 stacks are enabled per GPU, cutting usable memory to about 250-252GB, system memory from 2.3 TB to 2.0 TB, and aggregate memory bandwidth from 176 TB/s to 130 TB/s. NVIDIA has not explained the revisions; buyers should size clusters from the final system-level spec sheet.
Application Scenarios
Rubin R200 targets data center and supercomputing scenarios, suitable for:
- Trillion-parameter LLM training
- High-performance AI inference (low latency, high throughput)
- Reinforcement learning (RL) and agentic AI
- Scientific computing and AI factories
November 2026 Update: AI Factory Delivery and Rack-Level Memory
NVIDIA's November newsroom updates list several Rubin delivery milestones: the Vera Rubin DSX AI factory reference design and DSX POD (a modular containerized system the vendor says can cut on-site deployment from about six months to 14 days once utilities are ready), Vera Rubin NVL72 and the Vera CPU becoming available on CoreWeave with Cognition as the first production agentic-AI customer, and the platform opening to the OCP ecosystem. Dell and HPE NVL72 pre-order pages updated November 5 list 72 Rubin GPUs plus 36 Vera CPUs per rack, 288GB HBM4 per GPU and about 20.7TB per rack, liquid cooling only; HPE marks December 2026 availability and Dell the second half of 2026. All figures are vendor-reported and not independently benchmarked.
This week NVIDIA also detailed the NVL72 memory strategy: per-GPU HBM capacity rises only about 3% versus GB300, with gains coming from system design — NVFP4 compression of weights and KV cache, sharding weights across all 72 GPUs, using the Vera CPU large memory as a buffer tier, Dynamo for context migration, and pushing RAG indexes and inactive context to cheaper storage. The company claims up to 30x cost-adjusted agentic inference throughput over GB300 NVL72. That "up to" number is a vendor claim without independent verification and should not be entered into the TCO calculator. The durable point is that memory becomes a rack-wide schedulable pool rather than a fixed per-chip ceiling.
A NAVER regulatory filing dated November 6 says the $1 billion NVIDIA investment has completed payment, leaving NVIDIA with a 4.13% stake earmarked for GPU infrastructure at the Sejong data center and a GPU-as-a-Service business. This is a capital move and changes no specification on this page.
The same filing, reported by Yonhap and the Korea Times on November 6, adds the mechanics: NAVER issued 6,558,435 new common shares for about 1.3 trillion won, making NVIDIA its third-largest shareholder. The first site is the Gak Sejong data center, operated by Naver Cloud, with a plan to bring 55MW online in the first half of 2027, expand to 200MW in 2028 and a longer-term 1GW concept. Brookfield has a compute-infrastructure agreement with NAVER worth up to $9 billion. This is sovereign-AI capital and data-center capacity, not a Rubin rack order or a delivery schedule.
November 8, 2026 Update: Two Competing Views on Delivery Pace
A supply-chain account circulating on Taiwanese investment forums on November 8 claims Rubin rack delivery guidance for late 2026 was cut from at least 7,000-8,000 racks (optimistic case 11,000-12,000) to a more realistic 4,000-5,000, citing HBM4 yield variability, system stability under sustained stress testing, interconnect and software validation workload, and unresolved liquid-cooling and power issues. It suggests volume ramp may slip to the second half of Q1 2027 and that second-tier server vendors and some neoclouds face larger cuts than top-tier ODMs.
Sourcing note: this is an unnamed supply-chain claim relayed on investment forums, unconfirmed by NVIDIA or any vendor, and not an official guideline or independently verified reporting. It does not necessarily contradict the "full production" status and CoreWeave NVL72 availability recorded above — production status, shipment batches and customer racking are three different things. No specification or status on this page changes. Buyers should watch verifiable delivery evidence (vendor availability dates, cloud instance GA, rack revenue recognition in quarterly filings) rather than forum rack counts. The same source's claims about Google TPU timing and external compute rental are likewise unverified and are not recorded here.
2026-11-13 update: public MLPerf v6.1 entries and vendor multiples
NVIDIA's developer page now lists the MLPerf Inference v6.1 Closed Division entries for Vera Rubin NVL72: 1,183,327 tokens/sec on DeepSeek-R1 Offline with 72 VR200 GPUs, and 2,393 samples/sec on Qwen3-VL 235B (GB300 NVL72 is listed at 1,305 samples/sec on the same page). These are public submissions, not preview figures.
In its v6.1 preview material NVIDIA separately claimed up to 3.7 times the throughput of GB300 NVL72 on cited Qwen3 VL workloads, with a note that post-submission results had not yet been verified by MLCommons. The same material quotes up to 10 times throughput per dollar on an AgentX workload and up to 35 times token throughput per megawatt on long-context models. Those figures use different workloads and denominators; they do not validate one another and cannot be converted directly into customer savings.
On November 12 AMD compared its own 21,333 tokens/s/GPU result against the public DeepSeek-R1 entry above and claimed up to 30 percent higher throughput. The two sides did not run the same test: AMD ran an internal MLPerf configuration while NVIDIA submitted a public result. The MI455X page records the other side of that comparison.
Sourcing note: public benchmark entries plus vendor marketing material. The 3.7x, 10x and 35x figures are vendor claims on different workloads. The spec table is unchanged; throughput multiples are not compute specifications.
2026-11-17 update: Rubin HPC announced at SC26, half the specs are missing
At SC26 in Chicago on November 16, NVIDIA added another GPU to the Vera Rubin platform: Rubin HPC. The company says it targets simulation for science, engineering and analytics, packs more than 50,000 CUDA cores on one GPU (a company record), adds sparse data acceleration to keep those cores fed, and moves to seventh-generation NVLink, one generation ahead of the sixth-gen link listed for the Rubin GPUs on sale today. Ian Buck said in the keynote that it spans FP64 down to FP4, with availability expected in 2028.
The press post and the stage slide gave no HBM capacity, bandwidth, power, FP64 throughput, price or system configuration. A slide claimed "3x" simulation and analytics performance without naming a baseline. Later reports quoted 33 TFLOPS FP64 and eight HBM sites; those came from reading a product image or second-hand retelling, not from an official specification. They should not be copied into a procurement model.
Rubin HPC is not the Rubin R200 on this page. R200 is an AI training and inference GPU shipping in 2026; Rubin HPC is a 2028 HPC variant that trades more of the die toward general-purpose CUDA cores and away from AI-specific units. With no FP4 or FP8 figure published, carrying over R200's 50 PFLOPS NVFP4 would be wrong too.
Sourcing note: only claims confirmed by NVIDIA's blog and the SC26 keynote are recorded here. Press estimates, unsourced multiples and an unconfirmed report about Rubin CPX being cancelled are not written into the spec table. "2028" is an expectation, not a shipping commitment.
2026-11-19 update: nearly $20B in the first quarter, and the other side of the fastest ramp
The FY2027 Q3 results published on November 17 (quarter ended October 25) finally broke out Vera Rubin revenue. Total revenue was $115.8B, up 103% year over year; data center revenue was $107.6B, up 110%. The Rubin platform contributed nearly $20B in its first quarter of production shipments, about 18% of data center revenue, which the company calls its fastest product ramp ever. Racks are running at CoreWeave, Google Cloud, Microsoft Azure, Oracle Cloud and Nebius; Google Cloud's A5X instances and OCI's NVL72 systems are generally available.
The earnings call added two numbers that matter more to buyers. Token prices have fallen nearly 60% since May, while GPU rental rates across generations are rising: Hopper GPUs have recontracted at up to twice their original price under multi-year agreements, and B300 rates are up more than 60% since introduction. Utilization remains full. Cheaper calls and tighter supply are not contradictions; the first comes from model efficiency and competition, the second from physical constraints.
Q4 guidance is $130B plus or minus 3%, with no data center compute revenue from China assumed. Licensed Hopper products sold into China brought in $2.4B this quarter. The FY2028 growth outlook rose from 70% to 75%. Cloud industry backlog grew from $2T three months ago to $2.5T. That is the customers' cloud order pool, not NVIDIA's own undelivered orders.
Sourcing note: company results and management call commentary, not third-party audited product-level splits. The nearly $20B figure covers the Rubin platform, not a single SKU. Vera Rubin Ultra next year and Feynman in 2028 are roadmap statements. The spec table is unchanged.
2026-11-25 update: ramp-delay rumors — HBM4 is saturated, Rosalind yield is the variable
On November 16, Taiwan's supply chain reported that Vera Rubin's volume ramp (large-scale delivery) could slip from late 2026 to the first half of 2027, with GB300 filling the gap; NVIDIA has not confirmed. Distinguish this from the production start: volume production was announced in May, shipping disclosed in August, and the Q3 call confirmed NVL72 deliveries have begun.
The two candidate bottlenecks point in different directions:
- HBM4: an absolute capacity ceiling, not a failure. Both memory makers' HBM4 lines are running at 100% utilization (disclosed November 16), 12-Hi stacks ship on schedule, and Samsung's HBM4 revenue grew more than 3x quarter-over-quarter; some supply-chain voices say the HBM issue was resolved in October. NVL72 rack bandwidth had already been lowered from 1580 TB/s to 1400 TB/s (22 → 19.2 TB/s per GPU) — a design move to widen the qualified-supplier pool, not a defect.
- Rosalind NVLink switch board: a yield step function that can move dates. Per media reports of SemiAnalysis research, one of Rosalind's CCL suppliers uses the S9GN2 material with under 10% yield in volume PCB processing, versus roughly 70%-80% for TUC's EM-892K2. The substrate went from 22 to 32 layers (+45.5%) in one generation, and a material switch can swing output several-fold to over tenfold. About 50% of Doosan's related capacity investment lands in 2027.
Order-cut rumors circulated in parallel (up to 30% per Taiwan supply-chain chatter, tied to tighter export reviews and the Hong Kong H200 stockpile; unconfirmed by NVIDIA), with some claims that reduced 2026 Rubin orders are offset by incremental Blackwell shipments. Procurement implication: the delay mainly affects the 1H2027 ramp slope; GB300 rental windows lengthen, raising the value of long-term price locks.
Sourcing note: ramp delay and order cuts are supply-chain rumors, unconfirmed by the company; the S9GN2 yield figure is a media-transcribed SemiAnalysis estimate, with actual yield undisclosed. The spec table is unchanged.